Food & Beverage

a logo for sustainable action for a better tomorrow with an infinity symbol .

Food & beverage Industry

We have worked with a number of clients in the Australasian Food & Beverage industry. Get in contact with our team and find out how we can help you.


DETA Consulting excels in delivering impactful projects for the food and beverage industry by leveraging technical expertise and strategic project management. Working closely with clients, we address challenges and drive outcomes. For example, with Foodstuffs, we optimized plant layout and processes during facility relocation. Our partnership with NZ Sugar resulted in substantial savings and energy conservation. As-building services for Talley's Ashburton site and energy audits for Barkers Fruit Processors and Marlborough Wineries have empowered clients to enhance efficiency and reduce costs.



Download carbon roadmap guide Need advice? Get in touch
A white background with a few lines on it

Our goal is to partner with you and understand your business. Working together we can make positive long-term impacts on your organisational performance, efficiency and the environment.

Contact Our Team

With our proven track record of delivering successful outcomes, including business case development and project management for Kraft Heinz, DETA Consulting remains committed to driving positive change and innovation within the food and beverage industry.

 

Food & Beverage Industry Case Studies

Foodstuffs Plant Layout | DETA Consulting
by Simon Mullinger 27 September 2019
Check out our Plant Layout & Process Review for Foodstuffs. DETA developed a new facility that will bring about layout, process & productivity improvements.
Sugar Energy Graduate Support Role | DETA Consulting
by Simon Mullinger 3 September 2019
DETA did an Energy Graduate Support Role for NZ Sugar. So far, the project has achieved over 10 GWh/year, equating to $250,000 per annum. Read more!
Talley’s Ashburton As-Building Services | DETA Consulting
by Simon Mullinger 28 September 2017
DETA provided complete as-building services for Talley’s Ashburton by using a 3D BIM package, to represent the process & make quick changes. Read more!
a row of washing machines are lined up in a warehouse .
by Simon Mullinger 3 September 2017
DETA provided an Energy Audit for reducing energy & water usage at Barkers Fruit Processors. It helped $86,200 in Annual Savings with a 2.5 Year Payback.
ketchup is being poured from a bottle on a black background
by Simon Mullinger 28 September 2016
DETA undertook project management for Kraft Heinz, including full contract management, onsite supervision & verification of savings being achieved. Read more!
a factory with a lot of stainless steel tanks
by Simon Mullinger 3 September 2016
DETA performed multiple energy audits for Marlborough Wineries with 1,600 MWh of potential energy savings at 5 sites to reduce energy consumption. Read more!
Show More
Share by: