DETA Consulting designed a solution to recover heat from the neighbouring rendering plant to preheat site water, and increase the storage capacity of the hot water system.
8 GWh/annum saved. Equivalent to $1.1M/yr, 9.4% of their site energy consumption, (or the energy cost of 32,000 m² of office space).