We developed a project, using Alliance's capex process, to both reduce the flow of the sterilisers and improve the heat recovery system at site. As part of this, we also included flow metering so that the hot water consumption could be managed and monitored.
Thanks to the short payback, we also included upgrades to the hot water system, such as lining a hot water tank, to make the system more robust and reduce ongoing maintenance costs.