Our extensive experience allows us to deliver optimum solutions for our clients. This experience includes technical expertise, scope definition, delivering expected outcomes, time and budget management, solution development and environmental management.
ANZCO Foods
Canterbury Heat Recovery Project Management


October 2013
PROBLEM
Hot water is an expensive commodity at meat processing sites. ANZCO Canterbury’s hot water was the most expensive within the ANZCO group due to the way it was heated.
SOLUTION
DETA Consulting designed a solution to recover heat from the neighbouring rendering plant to preheat site water, and increase the storage capacity of the hot water system.
OUTCOME
8GWh/annum saved. Equivalent to $1.1M/yr, 9.4% of their site energy consumption, (or the energy cost of 32,000m² of office space).
CONTACT US TODAY

